657 kW Rooftop Solar System in Linwood, NJ
How SolarKal Engineered at $600K Save!
When a $1.1M solar project was nearly derailed by $830K in required grid upgrades, SolarKal engineered an alternative solution with local utility that leveraged local T1 fibers. The change cut costs to $227K — a $603K savings — and kept the project on track for late 2024 completion.
• Secured USDA REAP grant covering 40% of system costs
• Achieved $100K+ in annual energy bill savings
Position your business as a leader in sustainability, reaping solar's financial, environmental, and reputational benefits.